ASHGABAT OLYMPIC VILLAGE BUSINESS CENTER AND MINISTERS' OFFICES
The complex including the Office, shopping center, ministry offices are
composed of two blocks and the connectlon blocks between blocks as a
part of Ashgabat Olympics Complex in Turkmenistan, Ashgabat. All
mechanical installation system of the Complex such as heating cooling
air conditioning, plumbing, fire, smoke extract and pressurization
systems, installation and material supply are completed under the
responsibility of Atakon Engineering.
Project Details
|
Location
| Ashgabat / Turkmenistan |
|
General Scope
| Internal and External Mechanical Works |
|
Customer/Employer
| Polimeks A.S. |
|
Total Area
| |
|
Closed Area
| 30.000 m2 |
|
Date of Contract
| 28.08.2012 |
|
Time of Work
| 15 months |
|
|