In the centre of Ashgabat city, groups of pond filtration and transfer
pumps, pump room of 8 involving supply of materials and installation of
the mechanical installation works which is covered by Olympic village
Project, According to Project; Galvanized Steel up to DN800 HDPE
project of installations consisting of steel manufacturing was
manufactured in Turkey, which was transfered and established
punctually after Steel production was done hot-dip galvanized.
Location
Ashagabat / Turkmenistan |
General Scope
Internal and External Mechanical Works
|
Customer/Employer
Polimeks A.S. |
Total Area
3.370 m2 |
Closed Area
3.370 m2 |
Date of Contract
17.05.2013 |
Time of Work
8 Months |