ASHGABAT AIRPORT WATER DISPLACEMENT LINE
2150 m DN1200 (12 mm) Black Steel Pipes are wanted to be displaced
by the Ministry. Pipe joining with certified welders, excavation, filling,
sand supplying, sand routing, compression, security measures against
collapse, the issuance of topagraphic Services, moving the materials to
the site, design, supply and construction works have been completed
under the responsibility of Atakon Engineering
Project Details
Location
| Ashgabat / Turkmenistan |
General Scope
| Airport Water Displacement Line
|
Customer/Employer
| Polimeks A.S. |
Total Area
| - |
Closed Area
| - |
Date of Contract
| 06.07.2015 |
Time of Work
| 4 Months |
|
|