Medium Voltage system (total installed power of 2x2000kVA), Low
Voltage system, Weak current system and Automation System;
material supply and electrical installation works of Additional
Operating Blocks (A-B-C) are completed under the responsibility of
Atakon Engineering.
Location
Orhangazi / Bursa – TURKEY |
General Scope
Electrical Works |
Customer/Employer
DÖKTAŞ DÖKÜMCÜLÜK TİC. SAN. A.Ş. |
Total Area
|
Closed Area
|
Date of Contract
11.04.2022 |
Time of Work
7 Months |